June 2003
The house as we bought it
View from the street
|
June 2003
View from the garden
|
June 2003
Indoors - the room in the corner
|
|
|
|
August 2003
Beginning of the work
|
August 2003
Future kitchen
|
August 2003- Garage
The water connection is installed
and a temporary electrical
connection (only 1 plug)
|
|
|
|
September 2003 - Garage
Water and heating pipes mounted
(though no heating system yet)
Electric cables connected
|
September 2003
Garage - view from the street
|
September 2003
This will be the bathroom
|
|
|
|
September 2003 - Garage
Concrete has been put on the floor
|
September 2003
The entrance hall and kitchen
|
|
|
|
|
Jan 2005 - The corridor
(view from the entrance hall)
|
January 2005 - The kitchen
(view from the dining room)
|
|
|
|
|
March 2005
|
March 2005
(you can notice that the big pile
of ground in the garden is removed)
|
March 2005
Construction of the 1st floor started
|
|
|
|
March 2005
Placing Velux window in the roof.
|
March 2005
Placing the window -
view from inside
|
April 2005
Finished the corner in the living room
|
|
|
|
|
|
|
April 2005
The window is placed
(same room as on photo above)
and gyps boards mounted
(the room is used as a
temporary storage)
|
April 2005
Smaller bedroom on the 1st floor
Not yet decorated -
dry boards and plaster only
|